Formil Flooring Limited is an approved liquid screed laying contractors based between Omagh and Cookstown Co. Tyrone. We cover the whole of Northern Ireland and Ireland and have a number of trained and approved applicators.
In conjunction with CEMEX NI and LAFARGE GYVLON are now able to supply SUPAFLO liquid screed to the Northern Ireland market.
This product has been available in England, Scotland and Wales for 17 years, with many millions of square meters placed (year 2009; 2 million square meters) and many satisfied customers.
Contracts Manager
Email: formilflooring@hotmail.co.uk
Mobile: 07796 385793
Fergal Mc Crory
Surveyor
Email: fergal.formilflooring@hotmail.com
Mobile: 0788 7743357
Formil Flooring Limited is an approved liquid screed laying contractors based between Omagh and Cookstown Co. Tyrone. We cover the whole of Northern Ireland and Ireland and have a number of trained and approved applicators.
In conjunction with CEMEX NI and LAFARGE GYVLON are now able to supply SUPAFLO liquid screed to the Northern Ireland market.
This product has been available in England, Scotland and Wales for 17 years, with many millions of square meters placed (year 2009; 2 million square meters) and many satisfied customers.
![]() | ![]() | ![]() |
CEMEX SUPAFLO | SAND and CEMENT | |
Productivity | Easily up to 2000m2 per day Average 500-1000m2 per day | Only 100 to 150m2 per day |
How quickly can you walk on the floor? | Within 24 -48 hours No curing needed | Should not be walked on for 7 days Requires covering and curing |
Joints | 30-40 linear meters Following building Construction joints | Can only be laid in small bays of between 5-7 linear meters |
Performance | Very low shrinkage Minimal cracking Will not curl | Shrinks Cracks Curls |
Surface Finish | Easily achieves SR2 under BS 8204 | Dependent on contractor Curls and cracks at joints |
On Insulation | No reinforcement required 40mm minimum thickness in commercial buildings 35mm minimum in domestic buildings | D49 or fibre reinforcement 65mm minimum thickness |
Un-bonded Floor Construction | Polythene laid directly to substrate minimal preparation No reinforcement 30mm minimum thickness | D49 of fibre reinforcement 50mm minimum thickness |
Average Drying Times | 1mm per day up to 40mm Dependent on the site conditions | 11 weeks at 75mm thickness Dependent on site conditions |
Quality Control | Produced under BS EN 13454 | Often mixed on site by hand with poor quality control Labour intensive Inconsistent |
Cost | In most applications CEMEX SUPAFLO gives cost / time savings over traditional hand applied sand and cement screed. |
![]() | ![]() | ![]() |
![]() | ![]() |