Construction Ireland Construction Directory
Time and date
CONSTRUCTION DIRECTORY

Formil Flooring Limited

Formil Flooring Limited Contact Details

Address
11A Mullydoo Road
Greencastle
Omagh
BT79 8HB
N.Ireland

About Formil Flooring Limited

Martin Tracey
Contracts Manager
Email: formilflooring@hotmail.co.uk
Mobile: 07796 385793
 
Fergal Mc Crory
Surveyor
Email: fergal.formilflooring@hotmail.com
Mobile: 0788 7743357



Formil Flooring Limited is an approved liquid screed laying contractors based between Omagh and Cookstown Co. Tyrone. We cover the whole of Northern Ireland and Ireland and have a number of trained and approved applicators.

In conjunction with CEMEX NI and LAFARGE GYVLON are now able to supply SUPAFLO liquid screed to the Northern Ireland market.

This product has been available in England, Scotland and Wales for 17 years, with many millions of square meters placed (year 2009; 2 million square meters) and many satisfied customers.

Formil Flooring Limited ImageFormil Flooring Limited ImageFormil Flooring Limited Image

CEMEX SUPAFLOSAND and CEMENT
ProductivityEasily up to 2000m2 per day

Average 500-1000m2 per day
Only 100 to 150m2 per day
How quickly can you walk on the floor?Within 24 -48 hours

No curing needed
Should not be walked on for 7 days

Requires covering and curing
Joints30-40 linear meters

Following building Construction joints
Can only be laid in small bays of between 5-7 linear meters
PerformanceVery low shrinkage

Minimal cracking

Will not curl
Shrinks

Cracks

Curls
Surface Finish Easily achieves SR2 under BS 8204Dependent on contractor

Curls and cracks at joints
On InsulationNo reinforcement required

40mm minimum thickness in commercial buildings

35mm minimum in domestic buildings
D49 or fibre reinforcement

65mm minimum thickness
Un-bonded Floor ConstructionPolythene laid directly to substrate minimal preparation

No reinforcement

30mm minimum thickness
D49 of fibre reinforcement

50mm minimum thickness
Average Drying Times1mm per day up to 40mm

Dependent on the site conditions
11 weeks at 75mm thickness

Dependent on site conditions
Quality ControlProduced under BS EN 13454Often mixed on site by hand with poor quality control

Labour intensive

Inconsistent
CostIn most applications CEMEX SUPAFLO gives cost / time savings over traditional hand applied sand and cement screed.

Formil Flooring Limited ImageFormil Flooring Limited ImageFormil Flooring Limited Image
Formil Flooring Limited ImageFormil Flooring Limited Image

Formil Flooring Limited Serves The Following Areas

Dulux Paints Ireland LimitedFast Floor Screed LtdPremier Floor ScreedPremier Floor ScreedEcocelStone Systems LimitedWallace Fencing & Agri Services LtdPowerscreen Ireland LtdGroundforceTurboChip Ireland Ltd
Terms and Conditions
2023/03/23 14:19:55