Reconstruction and resurfacing work has begun on the Main Street in Saintfield.
The work on the £200,000 scheme will take place from its junction with the A7 Belfast Road to the Ballynahinch side of the Downpatrick Street junction.
On completion of the preliminary works, a temporary one-way system will be introduced to allow the excavation and reconstruction of the street.
(CD/JP)
Ireland
UK
Scotland
London











