Construction work is underway to build a new £35 million leisure centre in Craigavon, Armagh.
The project is expected to create more than 500 jobs during construction.
NI construction firm Farrans has been appointed to develop the new centre which has been scheduled to open in 2020.
The new centre will feature a 50-metre swimming pool with a moveable floor, teaching pool, fun pool and spectator gallery as well as state-of-the-art gym equipment, spin and dance studios, an extensive health and beauty suite, activity rooms, squash courts and a large sports hall.
Armagh City, Banbridge and Craigavon Borough Council has announced that the former leisure facility will be demolished and replaced with a temporary space for the duration of the project. The space will be located at the western shore of the lake in the grounds of Craigavon Civic Centre, and is set to open this summer.
Lord Mayor of Armagh City, Banbridge and Craigavon, Alderman Gareth Wilson, said: "This is a really exciting time in the creation of this landmark leisure development, with good early progress made that will pave the way for an outstanding facility which can be enjoyed by everyone."
(CM)
Ireland
UK
Scotland
London







![Swords Auto [Traffic Management]](http://www.construction.co.uk/advnew/489306bul.jpg)



