County Down headquartered, GRAHAM, has opened Beaulieu Parkway Bridge in Chelmsford.
This installation is the longest bridge in the UK that has been installed using Self Propelled Modular Transporters (SPMT).
By installing Beaulieu Parkway Bridge people travelling from Beaulieu and Channels estates as well as further into Springfield have easy access to the A12 running from Chelmsford north to Ipswich and south to London.
The installation methodology developed and executed at Beaulieu Parkway Bridge demonstrates the innovative approaches to bridge installations GRAHAM is able to offer clients.
Developers L&Q and Countryside funded the installation of this curved bridge.
Key statistics of Beaulieu Parkway Bridge include:
• Bridge Weight during Installation – 2400 Tonnes
• 42m long cantilever during Installation
• 161m overall bridge length
• 248no. SPMT Axle Lines used
• 12no. SPMT PPU’s (Power Pack Units)
• 16no. MJS300 Jacking Towers
• 1000 Tonnes of Temporary Support steelwork
Ireland
UK
Scotland
London











