Subscribe to our Construction Newsfeed
Ireland Construction Directory
Search our 25,507 companies....

Construction News

27/06/2024

Major Student Accommodation Scheme Plans Approved in Dublin

Plans for a major student accommodation scheme in Dublin have been given the go-ahead.

The proposals, located on the Naas Road, were given the green light by An Bord Pleanála.

Designed by London based, leading International Architecture and Urban Design practice, HKR Architects for Hollybrook Homes, the Gowan House development will provide 899 purpose-built student rooms (including 44 accessible units and 24 studios) across buildings varying in height from thirteen storeys to ten storeys. The masterplan includes shared community and cultural space, retail space and an attractive public realm positioned on the River Camac.

An Bord Pleanála overturned a previous refusal by Dublin City Council at Gowan House on the grounds that student residential was not an appropriate use on the site and the mass of the proposal was inappropriately large.

Joao Ornelas, Associate Director for HKR Architects commented: "We welcome An Bord Pleanála’s decision to overturn a previous ruling by the Dublin City Council for this development, which brings 900 student beds to the city. The decision addresses the considerable pressure to supply student housing and creates a great opportunity for future regeneration within the City Edge masterplan.

"Our extensive PSBA experience together with our client’s long knowledge of the student sector has empowered the team to create a very viable and efficient scheme, achieving optimum site value in line with HKR’s well established ‘Value by Design’ ethos. This is something we pride ourselves on and bring to all our projects.

"This development is unique as it is one of the first to address the daylighting a culverted River in this case the Camac within the City Edge Strategic Framework. Opening a river running nine metres below ground level is challenging but will bring several benefits to the site and ultimately add value.

"This is a complex initiative required expert input from the dedicated specialist team. The creation of a low intervention Riparian Zone will encourage biodiversity, increasing plant diversity, food resources and higher quality shelter to the benefit of wildlife inhabiting and commuting through the area. It also improves the overall flood resilience along the River Camac."

-- Advertisement --

Several innovative design measures were adopted to meet the project brief as well as address DCC’s policy aspirations. River daylighting was maximised, which in turn optimises the ecological benefit while providing a wonderful visual amenity to all the spaces overlooking the river.

The scheme includes extensive roof gardens as external amenities. This move in the landscape strategy allows the quantum of public realm to be increased, offering an interesting experience for the public with a treetop walk ‘floating’ over the river, providing an attractive visual and ecological feature to this new urban quarter. A pedestrian bridge connects the residential blocks, enabling the communal amenities to be shared between all blocks. This design has the operational benefit of a single entrance point from which residents are distributed across the dissected site.

The façade composition utilises complementary and contrasting colours to modulate the general mass of the scheme adding variety and interest to the overall composition. Pre-cast concrete components are proposed in the façade design, providing a high-quality finish with a considered of colour textures and patterns. This robust low maintenance material ensures the continued appearance of the façade through a full life cycle. The use of prefabricated elements brings all the benefits of offsite construction to the project and aligns with HKR’s decades long expertise in industrialised construction.

Internally the standard rooms are arranged in clusters, each featuring three to eight bed spaces with shared living, kitchen and dining areas. HKR have maximised the number of dual aspect clusters, creating 67% dual aspect sitewide avoiding single aspect north-facing clusters.

5% of the rooms are accessible and located near circulation cores for ease of access. Excellent provision is made for disabled users in all circulation spaces and communal areas. All landscaping, public and private has been designed to be fully accessible and inclusive.

Prioritising sustainable transportation, car parking provision is at an absolute minimum of nine spaces, including accessible parking. The development will improve the cycle network and offer extensive bicycle storage including cargo/adapted bike spaces and electric bike charging.

The development is accessed via a public south-facing plaza, leading to the central landscape, which includes the daylit segment of the river. The retail, cultural and community spaces, located on the western side of the site off Naas Road directly overlook the new square and public realm, activating and enhancing these spaces while providing new facilities for the surrounding neighbourhood.

Jerry Ryan, HKR Executive Chairman commented: "HKR Architects have a long tradition of challenging consensus and optimising mixed use urban regeneration. Smithfield Square constructed in 2003 represented a step change in the density of urban redevelopment in Dublin with a plot ratio of 5.5. Recently it was voted the second ‘coolest neighbourhood’ in the world by TimeOut, second only to Medellin in Columbia.

"Later HKR achieved a grant of permission at Ballsbridge One with a plot ratio of 4.6 which kickstarted the regeneration of Ballsbridge Central. This grant of permission on the Naas Road represents a landmark decision in the city’s ongoing redevelopment. It addresses a very real housing need. Dublin’s housing shortfall should be addressed via multiple residential typologies including student accommodation and co-living as is demonstrably the case in all European cities. The idea of one size fits all does not address the reality of the diverse demography that is a city."

Latest Construction News

17/07/2026
Cork County Council has allocated almost €200,000 in grant funding to property and business owners across the county to support improvements to town centre properties. A total of 145 applications were submitted under the 2026 Streetscape Enhancement Scheme, with funding of €199,208.85 awarded to 11
Read More
17/07/2026
MRP has secured planning permission for a £250m redevelopment of Liberty House at Kensington Olympia, following approval by the London Borough of Hammersmith & Fulham’s Planning Committee. The project will deliver 110,000 sq ft of Grade A office space and a four-star, 371-bedroom Maldron hotel, pr
Read More
17/07/2026
Dublin City Council has marked a key milestone in the regeneration of Phase 1 at Cromcastle Court and the Old Coalyard site in Coolock, Dublin 5, with the official start of demolition works. Lord Mayor of Dublin Daryl Barron officiated at the event, which signals the beginning of on-site activity t
Read More
17/07/2026
Water supplies are returning to customers in Cavan Town after a major leak on a water main at Billis Reservoir caused outages and reduced pressure on Wednesday evening. Uisce Éireann crews successfully isolated the leak and completed repair works on Thursday morning. Reservoir levels are now recove
Read More
17/07/2026
If you've just had building work done, here's the honest answer: "the builders cleaned up" and "the space is actually ready to use" are two completely different things. Most disappointment with after builders cleaning comes down to not knowing what should be included — so here's what a proper job ac
Read More
17/07/2026
Minister for Housing, Local Government and Heritage, James Browne TD, alongside Minister of State for Local Government and Planning, John Cummins TD, and Minister of State for Older People and Housing, Kieran O'Donnell TD, has published the Mid-Year Progress Report 2026 on the implementation of the
Read More
17/07/2026
Infrastructure Minister Liz Kimmins has announced a carriageway resurfacing project on the A2 Ballywalter Road in Millisle, beginning Monday 27 July 2026. The works will cover 1.1 kilometres of asphalt resurfacing from Drumfad Road to a point beyond Ballywiskin Road, aimed at improving the road’s d
Read More
17/07/2026
Swatragh-based digital construction start-up Hillside Designs is gearing up for significant expansion as it approaches its first year in business. Founded by Fintan O'Kane with support from the government-backed Go Succeed business support service, the company was established to meet growing demand
Read More
17/07/2026
Infrastructure Minister Liz Kimmins has confirmed a £420,000 carriageway resurfacing project on the A6 Glenshane Road at Curran will get under way on Monday 27 July. The scheme will cover around 1km of road between the Knockloughrim Link Road and Lurganagoose Road junctions. Minister Kimmins said:
Read More
17/07/2026
Infrastructure Minister Liz Kimmins has announced a £450,000 carriageway resurfacing scheme on the B7 Chapel Hill Road in Mayobridge, beginning on Monday 27 July 2026. The project will cover 1.6 kilometres across two stretches: an urban section from the roundabout to just beyond Chapel Car Park, an
Read More
WTH SuppliesConstruction Information ServicesLoocube.ieSiteCrew LTDJK Home ImprovementsBOLTSANDNUTS.IEEvex LimitedORourke Well DrillingForde Seamless GuttersOne Stop Handling Ireland Ltd