Subscribe to our Construction Newsfeed
Ireland Construction Directory
Search our 25,508 companies....

Construction News

05/08/2025

Astatine And Premier Electrical Group Deliver Uform's Solar Project

Astatine, Ireland's leading industrial decarbonisation specialist, and PV Solar experts Premier Electrical Group have successfully completed a large-scale rooftop solar installation at Uform's 225,000 sq ft manufacturing and distribution facility in Toomebridge, County Antrim.

The project was delivered on behalf of Uform as part of its wider investment in sustainable manufacturing and energy efficiency.

The state-of-the-art rooftop solar PV energy system boasts an impressive 500 kW capacity, powered by approximately 1,130 high-performance solar panels. This advanced installation is projected to generate around 400,000 kWh of clean energy annually – reducing Uform's grid electricity consumption by 17%. In environmental terms, this initiative cuts carbon emissions by an estimated 130,000 kg CO2 each year – the equivalent of the annual carbon offset produced by approximately 9,000 evergreen trees.

-- Advertisement --

From a financial perspective, one of the key advantages of transitioning to renewable solar energy is the projected annual savings of £87,000 in electricity costs, significantly reducing Uform's manufacturing expenses. With an estimated payback period of three-four years, the investment not only supports long-term sustainability goals but also delivers meaningful cost efficiencies that positively impact the bottom line.

Commenting on the new solar project, Tom Marren, CEO of Astatine said: "Our collaboration with Uform highlights the company's dedication to forward-thinking energy solutions, reducing the company's reliance on traditional power sources while reinforcing long-term sustainability goals. The project also shows the incredible benefits and potential of rooftop solar solutions which leverage otherwise unused space for real world energy-reductions and money savings – doing right by the environment while boosting the bottom line."

Uform Group CEO, Simon Oliphant, added: "We're thrilled to have undertaken this ambitious project, which underscores our commitment to reducing our carbon footprint and is helping us to achieve our energy reduction targets as part of our overall company environmental and sustainability goals. Plus, the total project savings, over an estimated 25 years, runs to nearly £2.9 million, that is a considerable saving for our operations. From start to finish, the Astatine team has made the whole design and installation process seamless, and the results have exceeded our early expectations."

Latest Construction News

24/07/2026
Belfast Harbour has launched a new Community Impact Fund, committing up to £600,000 over the next three years to support organisations delivering sustained, long-term change across Greater Belfast and beyond. The scheme will make four awards of up to £50,000 per year, providing £200,000 in annual i
Read More
24/07/2026
The London Irish Centre has appointed Sisk, one of Ireland and Britain's leading construction firms, as the main contractor for the £36–£38 million transformation of its home at 50–52 Camden Square. Work is due to start in early 2027 and the centre is planned to reopen in Q1 2029, marking a major s
Read More
24/07/2026
The Department for Infrastructure has confirmed that preparatory works to facilitate structural repairs on the A6 Glenshane Road at Dungiven (Carn) will start in the week beginning Monday 27 July 2026. The essential scheme is required to maintain the carriageway and drainage infrastructure at this l
Read More
24/07/2026
Fingal County Council's Conservation Office is inviting applications for the 2026 Stitch in Time (SIT) conservation grant, an annual programme that helps owners of historic buildings with small repairs and routine maintenance. The scheme is open to protected structures and properties located within
Read More
24/07/2026
Cork City Council thanked the teams who installed and planted the new planters, which are helping to refresh the city’s main thoroughfare. Completion of the initial planters is the latest step in a series of city centre improvements, which also includes work to tidy and restore the railings on the
Read More
24/07/2026
Infrastructure Minister Liz Kimmins has confirmed a £675,000 road improvement scheme for Ballycorr Road, Ballyclare, commencing on 27 July 2026. The project will cover approximately 0.84km from the junction with the C37 Ballyeaston Road to the Craighill Manor junction, delivering new surfacing to b
Read More
24/07/2026
Economy Minister Dr Caoimhe Archibald has visited Newry to review a pilot flood protection programme designed to help city-centre businesses withstand future flooding. The Department for the Economy is providing £300,000 in 2026 to trial measures that will protect around 30 properties while testing
Read More
24/07/2026
Hannah Steeds and Vivian Foley were first home in the women's and men's races at the Gas Networks Ireland-sponsored Cork BHAA 5km on Wednesday, 22 July, with a record 780 participants completing the course along the Blackrock and Mahon Greenway. The after-work race began on the Blackrock–Mahon Gree
Read More
23/07/2026
Designer Group has been appointed to carry out the mechanical and electrical (M&E) works for the redevelopment of West One in London, a major refurbishment and rebuild located above Bond Street Underground station. Originally developed in the late 1970s, the existing West One Shopping Centre is bei
Read More
23/07/2026
Infrastructure Minister Liz Kimmins has confirmed a £750,000 carriageway resurfacing scheme on the C570 Greystone Road in Limavady, due to begin on Monday 27 July 2026. The project will cover approximately 1.37km of road between Broad Road and Scroggy Road, aiming to improve driving conditions and
Read More
Construction Information ServicesWTH SuppliesSanctuarysynthetics at GrasslandYardBoxTech Fab EngineeringVision Creative StudiosIrish Crane & Lifting LimitedLoocube.ieSiteCrew LTDJK Home Improvements