NI firm FK Lowry Piling has completed work on a wind farm development at Twin Rivers for I&H Brown.
The £325,000 Energy Sector Scheme, Twin Rivers Wind Farm, contains 14 wind turbines on a 630-acre site at Pasture Farm.
The Group also intends to open up footpaths on its land, creating a public access network which will connect local villages, the wind farm and local conservation areas, enhancing the areas appeal to tourists and local residents. The wind farm will also provide support for local environmental, educational and community projects.
FK Lowry Piling were sub-contracted to Lancashire-based I&H Brown to install 630 No. 270mm Sq. Driven Precast Piles to depths of up to 14m for working loads of up to 932kN.
The underlying soils consisted of firm/stiff Clays overlying medium dense to dense Sands before stiff Clays were encountered at depth.
(CD/LM)
Ireland
UK
Scotland
London











