Planning permission has been approved to develop a new water pipeline and additional structures for the transfer of treated drinking water from Vartry to Callowhill in Co Wicklow.
The new pipeline will secure the long-term water supply to north Wicklow and south Dublin and ensure the Vartry Water Supply Scheme continues to meet all drinking water standards.
The Vartry Water Supply Scheme was originally constructed in the 1860s and was a feat of engineering for its time involving the construction of a four-kilometre long tunnel under Callowhill to deliver water to the area.
The tunnel is in a poor state of repair and is being replaced by the new pipeline which will secure the water supply.
The proposed works will include:
• A new pumping station at the existing Vartry Water Treatment Plant
• Four kilometres of buried pipeline from Vartry to Callowhill
• A break pressure tank and a hydropower turbine at Callowhill to recover renewable energy from the pumped water.
(CD/JP)
Ireland
UK
Scotland
London











