A £260,000 carriageway resurfacing project in Maghera is set to get underway next Monday, 04 March.
The A29 Tobermore Road and adjoining Flyover Slip Road is set for an upgrade.
The roadworks are expected to be finished by Saturday 16 March.
The scheme will extend for a distance of approximately 650 metres from Glenshane Industrial Park to Mullagh Road, and for a distance of approximately 100 metres on the Flyover Slip Road from its junction with the Tobermore Road.
A cycleway and footway linking the existing cycleway/footway in Maghera to the vehicular entrance into the Craigadick Park & Share will also be added, and will continue along the A29 to its junctions with Craigadick Road.
Two-way traffic flow will be maintained for the majority of the works with lane closures under traffic signal control.
A mandatory 40mph speed limit will be enforced during the resurfacing works and overtaking will be prohibited.
The A29 Flyover Slip Road will also be closed to through traffic from Monday 04 March to Sunday 10 March.
Access to the Craigadick Park & Share will be via the A6 Glenshane Road junction for the full duration of the works.
Advanced warning signage for the closure will be provided and local diversion routes clearly signed.
(JG/MH)
Ireland
UK
Scotland
London










