Subscribe to our Construction Newsfeed
Ireland Construction Directory
Search our 25,507 companies....

Construction News

26/04/2021

New Merlo Turbofarmer Arrives

As Italian-made Merlo telehandlers continue to gain in market appeal, yet another new model has arrived on the market here, this time a top-of-the-line TF65.9T-170-HF Turbofarmer variant whose appeal will be almost equally shared among farm buyers, industrial and construction users.

Said by Denis McGrath, general manager of Merlo distributors, McHale Plant Sales to be "the best choice in every field", the new, more powerful, more highly-equipped TF 65.9 is a unit equally at home on the farm, in the grain store or as part of a farm contractor's fleet as it will be in a construction or industrial setting.

Attired in its familiar Merlo-green livery, the new, high capacity TF65.9T-170-HF range comprises three model variants. Beginning with the TF65.9 unit, it includes a TF65.9TCS-170-HF and range-topping TF65.9TCS-170 CVTRONIC-HF choice.

All powered by a Stage V compliant 4.5-litre, 4-cylinder, 125 kW- 170 hp turbo diesel engine with DPF and SCR system, attributes include a maximum lifting capacity of 6,500 kg, a maximum lifting height of 8.8m, and a top speed of 40 km/h.

-- Advertisement --

Other stand out features include hydrostatic transmission, EPD electronic control, load sensing hydraulics, transversal levelling, and a spacious 1,010mm wide FOPS and ROPS-certified modular cab with best-in-class visibility.

Underlining its multi-use versatility, the TF65.9 can be equipped with fork lifts, work cage, materials grab and bale clamps, loader bucket, crane hook and cables and other boom attachments alongside down-to-earth cleaning brushes, snow blade, and suchlike.

Compact dimensions increase the new unit’s manoeuvrability while two front and two rear cab-mounted halogen-type work lights add to its versatility. Other features setting it apart are its electronic joystick control with capacity sensor and its ASCS safety system.

On a 10-inch colour screen, operators can access a range of key data: items such as load and stability, the geometric limits of machine use, speed and adjustment of hydraulic settings, and information on the amount of loads handled is recorded and stored – updated in real time, according to operating conditions.

Safety-wise, an integrated safety system controls operating parameters while a ‘load control’ system automatically detects the attachment being used and configures the machine's boom extension and angle and other control variants accordingly.

On a broader front, continuously variable transmission increases torque at the wheels at low speeds. On slopes, a frame-levelling feature ensures that loads can be safely lifted.

New 'high flow' hydraulics with variable displacement pump and electronically controlled ‘flow sharing’ deliver a maximum flow of 160 l/min. A 'descent by gravity' feature drastically reduces fuel consumption during working, pick and carry cycles while an automated, press-button function can memorise and return the boom to its working position.

Latest Construction News

17/07/2026
Cork County Council has allocated almost €200,000 in grant funding to property and business owners across the county to support improvements to town centre properties. A total of 145 applications were submitted under the 2026 Streetscape Enhancement Scheme, with funding of €199,208.85 awarded to 11
Read More
17/07/2026
MRP has secured planning permission for a £250m redevelopment of Liberty House at Kensington Olympia, following approval by the London Borough of Hammersmith & Fulham’s Planning Committee. The project will deliver 110,000 sq ft of Grade A office space and a four-star, 371-bedroom Maldron hotel, pr
Read More
17/07/2026
Dublin City Council has marked a key milestone in the regeneration of Phase 1 at Cromcastle Court and the Old Coalyard site in Coolock, Dublin 5, with the official start of demolition works. Lord Mayor of Dublin Daryl Barron officiated at the event, which signals the beginning of on-site activity t
Read More
17/07/2026
Water supplies are returning to customers in Cavan Town after a major leak on a water main at Billis Reservoir caused outages and reduced pressure on Wednesday evening. Uisce Éireann crews successfully isolated the leak and completed repair works on Thursday morning. Reservoir levels are now recove
Read More
17/07/2026
If you've just had building work done, here's the honest answer: "the builders cleaned up" and "the space is actually ready to use" are two completely different things. Most disappointment with after builders cleaning comes down to not knowing what should be included — so here's what a proper job ac
Read More
17/07/2026
Minister for Housing, Local Government and Heritage, James Browne TD, alongside Minister of State for Local Government and Planning, John Cummins TD, and Minister of State for Older People and Housing, Kieran O'Donnell TD, has published the Mid-Year Progress Report 2026 on the implementation of the
Read More
17/07/2026
Infrastructure Minister Liz Kimmins has announced a carriageway resurfacing project on the A2 Ballywalter Road in Millisle, beginning Monday 27 July 2026. The works will cover 1.1 kilometres of asphalt resurfacing from Drumfad Road to a point beyond Ballywiskin Road, aimed at improving the road’s d
Read More
17/07/2026
Swatragh-based digital construction start-up Hillside Designs is gearing up for significant expansion as it approaches its first year in business. Founded by Fintan O'Kane with support from the government-backed Go Succeed business support service, the company was established to meet growing demand
Read More
17/07/2026
Infrastructure Minister Liz Kimmins has confirmed a £420,000 carriageway resurfacing project on the A6 Glenshane Road at Curran will get under way on Monday 27 July. The scheme will cover around 1km of road between the Knockloughrim Link Road and Lurganagoose Road junctions. Minister Kimmins said:
Read More
17/07/2026
Infrastructure Minister Liz Kimmins has announced a £450,000 carriageway resurfacing scheme on the B7 Chapel Hill Road in Mayobridge, beginning on Monday 27 July 2026. The project will cover 1.6 kilometres across two stretches: an urban section from the roundabout to just beyond Chapel Car Park, an
Read More
Construction Information ServicesWTH SuppliesACCON UK LtdApollo Scaffolding Ties LtdTurboChip Ireland LtdS & N GraniteGrantNexventurEMKO Industrial LtdAIM Engineering & Fabrications Ltd