A resurfacing scheme for Brookmount Road in Omagh is to start on Monday, 07 August.
The works includes strengthening and resurfacing of 338 metres of carriageway from Randall Drive to Brook Valley.
A road closure will be put in place from 9.30am to 4.30pm from Monday, 07 August, to Friday, 18 August, otherwise Traffic Control System will be operational.
During the closure the a two-way diversion will be via the A5 Great Northern Road and U1539 Tamlaght Road.
Ireland
UK
Scotland
London










